Cognitive Scaffold

Preparing your thinking workspace

arrow_back_ios_new
MENTAL MODEL · M12280

Juran Trilogy

Juran Trilogy
BusinessHigh supportManagement
Included
account_tree

Updated 2026-08-22

Loading revision record…

INTRODUCTION

English translation pending.

CORE DEFINITION

Proposed by Joseph Juran, the trilogy divides quality management into three progressive processes: quality planning sets goals and designs the processes that will meet them, quality control monitors performance against the standard and corrects deviation, and quality improvement runs breakthrough projects that raise the standard itself. The key qualification is that the three form a continuing loop rather than a one-time campaign.

SCAFFOLDING EFFECT

psychology

Reduce cognitive load

- Stage map: locate each quality problem in planning, control, or improvement before acting. - Gap closing: fix control failures first, then schedule breakthrough improvement for chronic issues. - Loop discipline: restart the planning stage whenever a new standard has been firmly established.

anchor

Anchor fast decisions

Defects arise from three separable causes: wrong design, unstable execution, and an outdated standard. Assigning each failure to its own stage lets planners correct the matching process instead of blaming inspection, and the improvement stage attacks chronic defects that control alone can only contain.

MINIMUM ACTION

In progress 0/1

Practice this model in one real situation:

Check to track your progress (stored locally)
Learning progress0%
account_treeGenealogyexpand_more
menu_bookReferencesexpand_more

Source support: Explicit

  • link
    zh.wikipedia.orghttps://zh.wikipedia.org/wiki/%E6%9C%B1%E5%85%B0%E8%B4%A8%E9%87%8F%E6%89%8B%E5%86%8CZH · Explicit
    verified

RELATED MODELS